Lonoke Clarifier Dome Installation

Project Info

  • Client: City of Lonoke
  • Location: Lonoke, AR
  • Delivery: Design-bid build
  • Contract: $387,606
  • Engineer: Bond Consulting Engineers

TOLM was the general contractor providing the construction and crane installation of a 66′ diameter clarifier dome with natural ventilation louvers and airflow adjustment dampers. Complete structure made of aluminum alloy to include structural framing, panels, and hardware.

OTHER PROJECTS

VIEW ALL PROJETCS

TUPELO BAYOU WWTP ODOR CONTROL

Location Conway, AR
Contract $3.1MM

Lonoke Clarifier Dome Installation

Location Lonoke, AR
Contract $387,606