Project Description
TOLM was the general contractor completing construction of odor control improvements at the 65 acre TBWWTP. The project consisted of the installation of two separately located and operated odor control systems including construction of concrete equipment pads; installation of odor control vessels, blower fans, and related electrical controls; and installing a series of fiberglass reinforced plastic (FRP) ductwork and PVC ductwork. The completed system pulls air from high odor producing sources through the ductwork and into the odor control vessels, and the vessel processes absorb and eliminate hazardous odorous air.