Construction is in progress on this new greenfield water treatment plant capable of producing 15...
Read More >>Construction is in progress on this new greenfield water treatment plant capable of producing 15...
Read More >>TOLM is provided construction management services for the construction of a 2 MGD wastewater pretreatment plant...
Read More >>Water Treatment Plant installation of a 750,000-gallon pre-stressed concrete clearwell with an aeration system, and...
Read More >>TOLM led the design and construction team for an 11,000 sqft maintenance facility. Project scope...
Read More >>TOLM self-contracted the design-build of our corporate headquarters in downtown Morrilton. The project included the...
Read More >>Replacement of 5 pumping units, motors, and electrical control equipment, installation of building ventilation improvements,...
Read More >>Design and construction of a third dry kiln, fuel delivery system including silo, hammermill and...
Read More >>TOLM was the general contractor providing the construction and crane installation of a 66′ diameter...
Read More >>TOLM was the general contractor completing construction of odor control improvements at the 65 acre...
Read More >>MAILING ADDRESS
PO Box 1800 | Morrilton, AR 72110
TOLM GROUP CORPORATE HQ:
210 N Moose St | Morrilton, AR 72110
(501) 354-6511 | Fax: (501) 354-6555
TOLM GROUP FIELD OPERATIONS:
57 Foster Drive | Morrilton, AR 72110
(501) 354-9087 | Fax: (501) 354-9074